Fully Interruptible Backup Generator Rate 1G & 2G

Wayne White Electric Cooperative logo

Generator Contract

Billing under this rate will only begin on June 1st or December 1st and must continue in one-year increments.

Name(Required)
For Load Control Notification.
For Notifications/Text Messages.
Preferred method of notification:
Please select any notification methods you would like to receive.
This field is for validation purposes and should be left unchanged.