Navigation
  Home Page
 
  Co-Op News
 
  Products
 
  Services
 
  Blower Door Tests
 
  Convect Air Heaters
 
  Geothermal Technology
 
  Marathon Water Heaters
 
  GE GeoSpring Heat Pump Water Heaters
 
  Tesco Surge Protection
 
  Air Evac Lifeteam
 
  Scholarship Application
 
  Sports
 
  Contact Us

Articles of Interest

Book pages flipping


Rate Schedules

  hand & bill graphic

Rate Schedule 1 & 2

Rate Schedule 3 & 18

Rate Schedule 4, 5, & 45

Rate Schedule 6

Rate Schedule 15


WEATHER RADAR

       Weather Radar

   LIVE RADAR-CLICK HERE


   
Rate Schedule 4, 5, and 45

Wayne-White Counties Electric Cooperative

Rate Schedule 4, 5 & 45

Commercial and Industrial 50 kVA or Less

Consumer-Owned Transformers

 

Type of Service                                                                                                          

Single-Phase, 60 Hertz, at the following voltage(s): 120/240 V or 240/480 V.

 

Availability

Available for commercial and industrial service for all uses including lighting, heating, and power subject to the rules and regulations as established or as may be from time to time adopted by the Cooperative.

 

Conditions of Service

All wiring, pole lines, and other electrical equipment furnished by the Consumer ahead and/or beyond the metering point, shall be considered the distribution system of the Consumer and shall be maintained by the Consumer

 

Rate Per Month

Facility Charge                                     $25.00

First 1500 kWh                                    $0.1000/kWh

Next 1500 kWh                                   $0.0890/kWh

Balance                                                            $0.0700/kWh

 

Discount

When the Consumer agrees to purchase their transformer (a) without additional expense to the Cooperative and (b) the Consumer assumes the responsibility and expense of the transformer, a discount equal to 2 percent of the amount of the Consumer’s net bill will be allowed.

 

Wholesale Purchase Power Cost Adjustment

The energy charges in the above rate shall be increased or decreased by 0.11 mill per kWh for each 0.10 mill, or major fraction thereof, by which the cooperative’s total wholesale power cost per kWh purchased for the preceding month exceeds or is less than 4.27 cents per kWh.  This provision applies only when approved by the Board of Directors.

 

Minimum Charge

The minimum monthly charge under the above rate shall be $31.00 for services requiring 25 kVA or less of transformer capacity is required or as specified in the Contract for Service.  For members requiring more than 25 kVA of transformer capacity, the minimum monthly charge shall be increased by $1.50 for each kVA or fraction thereof required in excess of 25 kVA or as specified in the Contract for Service.

 

Terms of Payment

The above rates are net, the gross rates being 10% higher.  In the event the current monthly bill is not paid by the 10th of the month, the gross rate shall apply.

            Tax Clause

In addition to the charges herein provided for, the consumer shall reimburse and pay the Seller an amount equal to any state or local taxes accessed or charged for the sale or furnishing of electricity by the Seller to the consumer; said amounts to be added tot he consumer’s monthly bills.

 

             Effective:                                                                                             June 1, 2003                                                               

 

                                                                                                        