Navigation
  Home Page
 
  Co-Op News
 
  Products
 
  Services
 
  Blower Door Tests
 
  Convect Air Heaters
 
  Geothermal Technology
 
  Marathon Water Heaters
 
  GE GeoSpring Heat Pump Water Heaters
 
  Tesco Surge Protection
 
  Air Evac Lifeteam
 
  Scholarship Application
 
  Sports
 
  Contact Us

Articles of Interest

Book pages flipping


Rate Schedules

  hand & bill graphic

Rate Schedule 1 & 2

Rate Schedule 3 & 18

Rate Schedule 4, 5, & 45

Rate Schedule 6

Rate Schedule 15


WEATHER RADAR

       Weather Radar

   LIVE RADAR-CLICK HERE


   
Rate Schedule 15

Wayne-White Counties Electric Cooperative

Rate Schedule 15

Irrigation

 

Type of Service                                                                                                       

Single or Three-Phase, 60 Hertz, at the following voltage(s): 240/480 V or 277/480 V.

 

Availability

Available to members of the Cooperative for irrigation service with a load of 25 kW or more in any of the Cooperative’s summer peak months of June, July, August and September.  Subject to the rules and regulations as established or as may be from time to time adopted by the Cooperative.

 

Conditions of Service

All wiring, pole lines, and other electrical equipment furnished by the Consumer ahead and/or  beyond the metering point, shall be considered the distribution system of the Consumer and shall be maintained by the Consumer.

 

Rate Per Month

Facility Charge                                     $25.00

Demand Charge                                   $3.00/kW

First 750 kWh                                                  $0.0800/kWh

Next 750 kWh                                                 $0.0700/kWh

Balance                                                            $0.065/kWh

 

The billing demand shall be the maximum kilowatt demand as established by the Consumer for any period of fifteen consecutive minutes during the month for which the bill is rendered, as indicated or recorded by a demand meter.

 

Wholesale Purchase Power Cost Adjustment

The energy charges in the above rate shall be increased or decreased by 0.11 mill per kWh for each 0.10 mill, or major fraction thereof, by which the cooperative’s total wholesale power cost per kWh purchased for the preceding month exceeds or is less than 4.27 cents per kWh.  This provision applies only when approved by the Board of Directors.

 

Power Factor

 The Member agrees to maintain unity power factor as nearly as practicable.  The Cooperative reserves the right to measure such power factor at any time.  Should such measurements indicate that the power factor at the time of maximum demand is less than 90% lagging, the demand for the billing purposes shall be the demand as indicated or recorded by the demand meter, multiplied by 90% and divided by the percent power factor.

 

Minimum Charge

As specified in the Contract for Service.

 

Terms of Payment

The above rates are net, the gross rates being 10% higher.  In the event the current monthly bill is not paid by the 10th of the month, the gross rate shall apply.

 

 


 

Tax Clause

In addition to the charges herein provided for, the consumer shall reimburse and pay the Seller an amount equal to any state or local taxes accessed or charged for the sale or furnishing of electricity by the Seller to the consumer; said amounts to be added to the consumer’s monthly bills.

 